in Sialkot Pakistan sales price shop near me near me shop factory supplier 2t Big Size Construction Hoist for Passenger Materials OEM manufacturer best Cost Custom Cheap wholesaler

  in Sialkot Pakistan  sales   price   shop   near me   near me shop   factory   supplier 2t Big Size Construction Hoist for Passenger Materials OEM manufacturer   best   Cost   Custom   Cheap   wholesaler

Trying to keep in mind that very good support is the key to cooperating with clientele, we attempt to meet substantial high quality requirements, provide competitive prices and make certain prompt shipping and delivery. With EPG model registered in a lot more than 70 nations like The united states , Europe , Japan and so on, it has companions among entire world prime enterprises, this sort of as JOHNDEERE, NEW HOLLAND, CLAAS, HONDA, KUBOTA, YANMAR, and so forth. Our items are manufactured by contemporary computerized machinery and equipment.

2t massive measurement Design EPT for passenger resources OEM

A. Major Items

CE Approved EPTig dimension Construction EPT vertical lifting EPT
Its primary sequence incEPT:

*EPT Building Elevator Passenger supplies hoist (inverter or PLC )
*OEM Mini hoist
*EPT hoist
*Twin mast hoist
*Lean hoist
*Building mast climber
*Transportation operate system
*Retractable loading system

Frequent PLC Manage massive size Construction EPT

Specification Sort Lifting Ability Lifting Pace EPT EPT Security Unit
Single cage SC100 1000Kg

33m/min

two*11Kw SAJ thirty-1.2
SC150 1500Kg 2 times13Kw SAJ forty-1.2
SC200 2000Kg three times11Kw SAJ 40-one.2
Twin cages SC100/100 1000KEPTimes2EA 2 times11Kw times2EA SAJ thirty-1.2
SC150/a hundred and fifty 1500KEPTimes2EA 2 times13Kw times2EA SAJ forty-one.two
SC200/200 2000KEPTimes2EA three times11Kw times2EA SAJ forty-one.2

Observe:
*Immediate commence and end with PLC delay brake manage design
*With out VFD, starting up current is very huge
*It is not able to bear large voltage fluctuation if a lot more than five%
*Power-intensive:It will value much more EPT than VFD sort

Reduced velocity VFD Handle massive measurement Development EPT

Specification Typemodel LiftingCapacity Lifting Pace EPT EPT VFD SafetyDevice
One cage SC100 1000Kg ~33m/min
~40m/min
two times11Kw 30Kw SAJ 30-one.two
SC150 1500Kg ~36m/min
~46m/min
2 times13Kw two times15Kw 30Kw 37Kw SAJ 40-one.2
SC200 2000Kg ~40m/min
~46m/min
2 times15Kw 3 times11Kw 37Kw SAJ forty-one.2
Twin cages SC100/one hundred 1000KEPTimes2EA ~40m/min two times11Kw times2EA 30Kw times2EA SAJ thirty-1.two
SC150/a hundred and fifty 1500KEPTimes2EA ~36m/min
~46m/min
two times13Kw times2EA
two times15Kw times2EA
30Kw times2EA 37Kw times2EA SAJ forty-one.2
SC200/two hundred 2000KEPTimes2EA ~40m/min
~46m/min
2 times15Kw times2EA
two times11Kw times2EA
37Kw times2EA SAJ forty-one.2

Reasonable pace VFD Management massive dimension Construction EPT

Specification TypeModel LiftingCapacity Lifiting Speed EPT EPT VFD SafetyDevice
Solitary cage SC a hundred 1000Kg ~60m/min 3 times13Kw 45Kw SAJ thirty-1.four
SC one hundred fifty 1500Kg ~63m/min
~60m/min
three times15Kw 2x19Kw(87Hz) 45Kw 55Kw SAJ forty-one.four
SC 200 2000Kg ~60m/min
~63m/min
~70m/min
~75m/min
2 times23Kw(87Hz) three times15Kw
three times19Kw(87Hz) 3 times23Kw(87Hz)
55Kw

75Kw

SAJ 40-one.4

SAJ50-one.6

Twin cages SC100/a hundred 1000KEPTimes2EA ~60m/min three times13Kw times2EA 45Kw SAJ thirty-1.4
SC150/150 1500KEPTimes2EA ~63m/min
~60m/min
three times15Kw times2EA 2x19Kwx2EA 45Kw 55Kw SAJ forty-one.4
SC200/200 2000KEPTimes2EA ~60m/min
~63m/min
~70m/min
~75m/min
two times23Kw times2EA(87Hz)
three times15Kw times2EA 3 times19Kw times2EA(87Hz)
three times23Kw times2EA(87Hz)
55Kw

75Kw

SAJ forty-one.four

SAJ50-1.six

Higher pace VFD Handle large size Construction EPT

Specification Kind/product LiftingCapacity Lifiting Speed EPT EPT VFD Safetydevice
One cage SC two hundred 2000Kg ~80m/min
~96m/min
three times26(87Hz)
three times18.five(87Hz)
90Kw
110Kw
SAJ 50-two.
Twin cage SC200/two hundred 2000KEPTimes2EA ~80m/min ~96m/min two times3 times26(87Hz) 2 times3 times18.5(87Hz) 90Kw times2EA 110Kw times2EA SAJ 50-two.

Note:
*Gentle start off and cease with VFD control
*Commencing current and voltage is ZERO, very very little, can protect the EPT web
*It can bear big voltage fluctuation for some EPT weak district
*Energy-saving:It will conserve EPT in close proximity to 40% than PLC typical hoist kind
*It can safeguard the EPT metal structure and sporting elements, prolong the hoist and spare components life time.

EPT. EPTFUL Assignments FOR Construction HOIST OVERSEA:
Our VFD Control massive dimensions Design EPT have been exported to UAE, Saudi Arabia, Kuwait, Qatar, Russia, Kazakhstan, Mongolia, Korea, Philippines, Malaysia, Indonesia, Myammar, TEPTd, EPTrazil, EPTarbados, Panama, Guatemala, Venezuela,Slovenia, British isles, Denmark and so on.

C. OUR Manufacturing facility amp Production:

Proffessional Manufacturer of VFD Handle EPTuilding Elevator Building EPT vertical carry.
one. -All Production Line of VFD Control massive dimensions Development EPT adopt Big CNC EPTs, EPT fixture, mould, gauge created by us to make sure all in depth size.
two.- Decide on substantial top quality uncooked content of VFD Management large dimensions Design EPT from EPT EPTao Metal Team, other like motors ,EPTs, EPT, basic safety unit with lower sounds, electrics is schneiEPTor Korea reputation manufacturer with reputable high quality
three.- EPT style,compact and realistic construction,easy to installation and adjustment.
four.- Each VFD Manage big dimension Development EPT should be test and make report in Factory, all details will be adjust like motor brake, security device procedure, all limit change operation, dropping check, loading examination, and mast EPT erection take a look at to ensure the completed constructing Building materials Passenger elevatorrun effectively when just take into use.

D. Products Prepared FOR Delivery:

E. Provider Pursuits

XiHu (West Lake) Dis.NGDOU VFD Management big size Construction EPT , are focus on all kinds of EPTuilding Building Passenger hoist for EPTuilding, tower, bridge and elevator shaft with distinct loading ability and variable velocity for 15 Years.We are manufacturer, solution proviEPTand EPT EPTist !

We, XiHu (West Lake) Dis.NGDOU, A Specialist Maker!
1. 15 Years VFD Management massive measurement Building EPT EPT experiences
two. 11 A long time VFD Manage big size Design EPT Exporting and service information for consumers oversea
three. CE Authorized, ISO9001, ISO14001,COC, EAC, TEPTCertified for creating Construction Passenger hoist
4. EPTest EPTrds of VFD Control large size Construction EPT max heigEPT is upto 400m
five. EPTest EPTrds of VFD Handle large dimensions Development EPT speed is upto 100m/min
6. VFD Handle massive dimension Construction EPT Yearly common exporting charge upto 50%

We, XiHu (West Lake) Dis.NGDOU VFD Manage huge dimensions Development EPT vertical raise, A EPT Action Crew !

WE, XiHu (West Lake) Dis.NGDOU VFD Control massive size Development EPT vertical carry, Maintain Good Partnership WITH Clients.

F. FAQ:

CE Authorized VFD Management big size Building EPT vertical elevate

1. What are your major merchandise?
We produce all sorts of massive measurement Development EPT vertical elevate from 500kg load to 3200kg load (also known as construction elevator, construction carry) and spare components of it.

2. Are all Design Elevator the identical from all Sellers amp Makers?
Our High rise huge dimension Construction EPT vertical carry with VFD for lifting components and travellers have exported to Europe, Middle and southern The united states, most of Asia, and some international locations from Africa, about 50 international locations. We can effectively match European stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds, Russia stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds and America stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds. We have EPT for deveXiHu (West Lake) Dis.Hu (West Lake) Dis.e new design and style capacity and we support a lot of client with very good remedies to remedy their development internet site EPT vertical entry problems.

three. Do your goods have some certificates?
Yes. Our big measurement Design EPT vertical carry have passed CE, EAC (Russia),ISO and SASO(Saudia) Certificates.

four. What are the payment terms and the shipping time?
Payment conditions for EPTuilding Elevator Development EPT vertical lift are T/T and LC. We will ship the cargo inside 20-thirty daEPTafter getting the thirty% deposit.

five. Are you company or the trader?
We are producer of big dimensions Design EPT vertical raise with 15 years maker encounters, have EPTd manufacturing line and inspection system. Our EPT and deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment team have obtained numerous praise from customers.

six. Will you deveXiHu (West Lake) Dis.Hu (West Lake) Dis. distributor and sole agent?
Sure, ought to you have any desire to be our EPTuilding Elevator Construction EPT vertical lift distributor and agent, make sure you permit us know in any methods. Sole agent is offered count on the sales turnover.

7. The place do you ship to and what nations around the world have you done business in?
We offer fast and efficient shipping and delivery of EPTuilding Elevator Construction EPT vertical carry to nations around the world all over the globe from EPTngdao port or other EPT port.
We have accomplished organization of EPTuilding Elevator Building EPT vertical carry with customers in a lot of international locations, this sort of as MeXiHu (West Lake) Dis.co, EPTrazil, Korea, Malaysia, TEPTd, India, Vietnam, Indonesia, UAE, Qatar, Kuwait,Saudi Arabia etc.

eight.Quotation ask for:
If you are intrigued in our big dimension Construction EPT vertical lift, make sure you give the subsequent parameters:
one) Raise heigEPT (m)
two) Load potential (ton)
three) Double cage or solitary cage
4) Mast tower coat: Portray spray or scorching galvanized?
five) Employing temprature?
6) Neighborhood EPT offer (V, Hz)
7) Is there any room minimal for your construction website? If yes, give us a brief drawing to present the area plz
8) Other EPT equipments.
nine) FOEPT or CEPT cost? If CEPT , plz permit us know your location port.

We will give greatest cost for large measurement Construction EPT vertical raise after confirmed the over. You can get our comments inside of twelve hrs !

  in Sialkot Pakistan  sales   price   shop   near me   near me shop   factory   supplier 2t Big Size Construction Hoist for Passenger Materials OEM manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Sialkot Pakistan  sales   price   shop   near me   near me shop   factory   supplier 2t Big Size Construction Hoist for Passenger Materials OEM manufacturer   best   Cost   Custom   Cheap   wholesaler

Leave a Reply

Your email address will not be published. Required fields are marked *